HomeCase StudiesTeamwork after Tree Troubles

Teamwork after Tree Troubles

Teamwork after Tree Troubles

Teamwork after Tree Troubles

Project Bathroom
Project type Residential
Project location Philadelphia, PA
About the Clients John is a long time member of the kitchen and bath industry, currently serving as the director for Franz Viegener, the high-end faucet, and fixture brand.
Heating systems DCM-PRO
System specifications
  • DCM-PRO Fleece-Backed Membrane
  • DCM-PRO Heating Cable
  • 4iE-04 Thermostat

Total Project Cost

Bathroom Renovation
$1,152.64
  • Membrane, $349
  • Heating Cable, $433.67
  • Smart WiFi Thermostat, $309
  • Backup floor probes $26.00
  • Alligator Tester, $20.00
  • Plastic Trowel, $14.97

Project: Bathroom rehabilitation

Project Type: Residential

Project location: Philadelphia, PA

About the Client: John is a long time member of the kitchen and bath industry, currently serving as the director for Franz Viegener, the high-end faucet, and fixture brand.

Heating systems: DCM-PRO

System specifications: Fleece-backed Membrane and DCM-PRO cable controlled by a 4iE Smart WiFi Thermostat

The Challenge 

On April 9, 2020, the weather near John’s family home in Philadelphia abruptly shifted from sunny and calm to a violent wind storm with 70-mph gusts that uprooted a large pine tree that fell directly onto his house. Sunny skies quickly returned, but the sudden storm left behind irreparable damage to the master bedroom and bathroom, with branches coming through the ceiling of both areas after breaking eight trusses. John and his family were home at the time, but miraculously, no one was injured. With a mess to clean and insurance only covering the structural damage and value of the original 20-plus-year-old fixtures, John and his family were forced into an unplanned bathroom remodel.

The Solution 

As a beloved member of the plumbing/kitchen and bath industry, John began getting numerous offers to assist with his bathroom remodel as he began planning. So many in fact that the project quickly became a collaborative showcase. John felt fortunate that no one was hurt when the tree fell and taken back when so many in the kitchen and bath industry wanted to donate to his remodel.

The Result 

The Weinstein’s new master bathroom is a true labor of love featuring underfloor heating, high-end fixtures, and mirrored cabinets produced in Switzerland. The collaboration from 11 brands in this bathroom rehabilitation shows the best side of the industry – a helping hand to one another when times are tough.

Product information


DCM-PRO

Thermostats


Related Projects

High-Tech Tiny Home – Built to Travel Anywhere

The Winkler’s Residence – Steamboat Springs, CO
The Bakewell Residence – Tucson, AZ